All networking services

Connect / Network engineering

Network Migrations & Modernisation

Move forward with a considered plan.

Discuss this service

The starting point

How can we modernise without losing sight of business continuity?

Plan and execute platform and service migrations with source-to-target mapping, batch validation, rollback preparation and change closure.

Prepare for the conversation

Identify the platforms to replace, service dependencies, and the change constraints your business works within.

Your priorities. A clearly scoped engagement.

Start with your business goals. Together, we define the systems in scope, the questions to answer, and a practical path forward.

Talk to Fikson

Engineering around your operations

Connect the design to the delivery.

Move from legacy infrastructure to a defined target state through controlled migration batches. Combine engineering validation, configuration preparation and service-health checks with a clear route for exceptions and recovery decisions.

What this helps you achieve

  • Clearer source-to-target dependencies
  • A repeatable plan for migration batches
  • Evidence supporting change acceptance and follow-up work

Technical capabilities

What we do.

Explore the engineering areas below. We agree the exact platforms, activities, responsibilities and acceptance criteria for your environment.

01 / ENGINEERING

Migration engineering

  • Legacy-to-target service and platform mapping
  • EG, SAT, SAG and AGG transition scope where applicable
  • Routing translation, platform behaviour and service dependencies
  • Redundancy, recovery and rollback design
02 / ENGINEERING

Port and configuration validation

  • Per-port identity, MAC and address consistency
  • CMTS/OLT relationships and platform compatibility
  • Migration scripts, port reassignment and QoS checks
03 / ENGINEERING

Readiness and execution

  • Source and destination audit against live configuration
  • Batch grouping, change tickets and controlled rehearsal
  • Approved windows with route, registration and service-health monitoring
04 / ENGINEERING

Exceptions and closure

  • Issue tracking and escalation during each batch
  • Post-change checks and unresolved exception review
  • Updated records and formal migration acceptance

Our delivery lifecycle

A clear path from plan to operation.

Each stage has a purpose, an owner and an agreed decision point. Use the engagement to make dependencies and handoffs clear.

Plan an engineering session
  1. 01

    Audit

    Reconcile the available records with the source and target environments. Identify gaps that could change the migration plan.

  2. 02

    Plan

    Agree batches, dependencies, change approvals, stop conditions and the people responsible for recovery decisions.

  3. 03

    Execute

    Run authorised changes with a shared event record and validation points. Escalate deviations through the agreed channel.

  4. 04

    Close

    Review acceptance evidence, remaining actions and lessons before proceeding with later batches or decommissioning.

Technology context

Work with the environment you need.

Bring your current platform inventory and target architecture. We confirm the relevant technologies, versions and integration boundaries during scoping.

  • IP / routing / QoS
  • Port and circuit inventories
  • Router / CMTS / OLT
  • Migration and rollback scripts
  • Change and ticket workflows

Documentation and acceptance

Make the handover useful.

Delivery is easier to operate when the records explain what changed, how it was checked and who owns the next step.

Outputs to define in your proposal

  • Migration mapping and batch plan
  • Change procedure and agreed rollback criteria
  • Execution and service validation record
  • Exceptions, acceptance decisions and updated inventory

Agree output formats, access, review milestones and unresolved-action ownership before work begins.

Before we begin

Questions for your engineering plan.

Can the work be divided into batches?

Yes. Group services around dependencies, operating constraints and available acceptance resources. A successful pilot informs later work without proving that every later batch will behave identically.

Who approves a rollback?

Name the decision maker and the trigger conditions before execution. The recovery plan must account for dependencies and the practical limits of reversing a change.

Do you validate the destination before cutover?

Readiness checks can be scoped for both environments. Define access, representative services and the evidence required before approving the change window.

Does migration include immediate decommissioning?

Not automatically. Retirement of source equipment, records and licences requires its own acceptance conditions and owner approval.

Let’s plan your next step

What would you like to improve?

Tell us where you are today. We’ll explore your priorities and a practical way forward.

Request a Consultation

Continue exploring

See the connected picture.

Combine the right conversations around your business priorities.